Yazaki Gas-Fired Absorption Chillers - References
Background
Advantages
Product Spec
Sales & Technical
References

THE UNIVERSIDAD AUTONOMA DE MADRID -
Spain
Project
The Universidad Autónoma de Madrid (Autonomous University of Madrid)
in Spain required a climate control system for a wide range of applications
in different libraries and faculty buildings. Energy efficiency, low fuel/electricity
costs and adequate heating/cooling performance were high priorities for
the university.
Task
The primary task was to integrate a large number of absorption cycle water
chillers throughout the university to service the large number of buildings,
each with varying requirements.
Solution
A total of 15 Yazaki Gas-Fired Chillers were installed to cover the university’s
air conditioning and heating requirements throughout the year. All the Yazaki
chillers installed are capable of providing air conditioning in summer and
heating in winter. Both the heat and cold produced by the units are distributed
by a closed water circuit.
The total cooling capacity installed is 4,188 kW. This arrangement is also capable of providing 3,717 kW of heat from the same machines.
The Yazaki CH-V range was the forerunner to the new CH-K range.
| Contact: 01274 744277 © Shorts | |